Churchill Meadows Community Centre & Sports Park
Mississauga • Stormwater, servicing and grading for the community centre and Mattamy Sports Park.
For more than four decades, Ontario municipalities and their architects have trusted EMC Group with the sites beneath their community centres, aquatic centres, arenas and sports parks.
Community recreation facilities are among the most demanding sites a municipality builds: large roofs and parking fields that concentrate stormwater, aquatic programs with heavy water and sanitary loads, sports fields that must drain, and public expectations for sustainable, LEED-calibre design — all delivered through municipal approvals on a public timeline and budget.
EMC Group has engineered more than thirty of these facilities, from the Audley Recreation Centre in Ajax to the new South End Community Centre in Guelph. Much of that work has been in long-standing collaboration with MJMA Architecture & Design — the studio behind many of Canada’s most celebrated recreation buildings — alongside other leading architects, and with municipal clients across the Greater Toronto Area, Simcoe County, Muskoka and southwestern Ontario. The result is a firm that understands what these buildings demand of their sites before the first drawing is issued.
Site engineering scoped to the realities of community facilities — from early feasibility through construction completion.
Four facilities that define the practice — each profiled in Award magazine.
Mississauga • Stormwater, servicing and grading for the community centre and Mattamy Sports Park.
Guelph • A 165,000 sq ft facility on a site with no storm outlet, engineered to protect a groundwater-based water supply.
Bracebridge • Multi-use community centre recognized with the 2025 PRO Award of Excellence for Facility Design.
East Gwillimbury • Community centre and library with EV-ready parking, active-transportation plaza and integrated site drainage.
Community centres, aquatic additions, arenas, stadiums and sports parks across Ontario.
Independent recognition of the facilities EMC has helped deliver.
Churchill Meadows Community Centre and Sports Park — Canada’s highest honour for built architecture.
Audley Recreation Centre (2013), Churchill Meadows (2021), Muskoka Lumber Community Centre (2024), South End Community Centre and the University of Toronto Academic Wood Tower (2026).
Muskoka Lumber Community Centre — Parks and Recreation Ontario award for facility design.
Audley Recreation Centre, Atlas Tube Centre, Sherwood Community Centre and the University of Guelph athletics facilities.
Bring EMC in at feasibility. Early site engineering shapes the layout, the approvals path and the budget.