On the Canada Day long weekend, June 30th to July 1st, 2011, EMC Group Limited managed the construction of a flood control / pedestrian box culvert installation across the Go Transit/ Metrolinx railway at King Rd. and Dufferin Street.
The project was completed for the King City East Landowner’s Group and constructed by Carillion Constructors Canada.
A time lapse video was produced and can be viewed at the following link: